Turnkey Interior Solutions in Saudi Arabia requires a contractor who can execute complex refurbishments while your business stays operational. Space […]
Turnkey Interior Solutions in Saudi Arabia requires a contractor who can execute complex refurbishments while your business stays operational. Space Arabia delivers complete workspace upgrades — from acoustic improvements and modern finishes to MEP retrofits and spatial reconfiguration — across Riyadh, Jeddah, Dammam, and the Kingdom. With 25+ years of live-environment renovation experience, we handle phased execution, after-hours work, and weekend schedules so your team faces zero disruption.
What’s Included in Our Renovation Scope
Finish Upgrades
New flooring (LVT, carpet tile, stone), painted walls, feature wallcovering, and reception area refresh
Acoustic Treatment
NRC 0.85–0.95 PET panels, acoustic baffles, sound masking systems, and echo reduction for meeting rooms
Ceiling Replacement
Replace stained/damaged tiles with mineral fibre, metal, or open-cell systems — night/weekend execution available
Lighting Retrofit
LED conversion (70% energy reduction), sensor controls, circadian lighting for wellness, and emergency lighting upgrade
Partition Reconfiguration
Add/remove/move glass, gypsum, or demountable walls to create new offices, meeting rooms, or open areas
MEP Refresh
HVAC deep clean, FCU replacement, diffuser upgrades, power outlet relocation, and data port additions
Riyadh — Complete office renovation for a financial services firm. Before/after: 12-week phased execution with zero business downtime
Our Live-Environment Renovation Process
Unlike new fit-outs, renovation requires surgical precision. We execute in phases, work after-hours, and maintain strict dust control. Here’s how we deliver upgrades without disrupting your business.
Site Audit & Condition Survey
We visit your existing office within 48 hours, document current conditions (as-built vs actual), test MEP systems, identify asbestos/hazardous materials (pre-1980s buildings), and provide a condition report with recommended priority upgrades.
Phasing Plan & Schedule
We divide your office into zones (e.g., Zone A: reception & open plan, Zone B: meeting rooms, Zone C: back office). We create a detailed Gantt chart showing which zone is renovated when — your team moves between zones during works. No full-office shutdown required.
After-Hours & Weekend Execution
Noisy works (ceiling demo, floor grinding, partition removal) scheduled Thursday–Saturday nights or full weekends. Quiet works (painting, finishing, furniture install) during business hours in vacant zones. Dust barriers and negative air machines contain debris to active zones only.
Phased Delivery & Move Management
Zone A completes → your team moves back in → Zone B vacates → renovation begins on Zone B. Repeat until full office complete. We provide temporary storage for furniture during each zone’s renovation window.
Final Integration & Handover
All zones complete → final snagging walkthrough (7-day window) → deep clean (HEPA vacuum, all surfaces) → IAQ test (indoor air quality) → as-built drawings showing new MEP/partition locations → 12-month defect liability.
Why Space Arabia for Office Renovation
150+ Live Renovations Completed
0 Business Days Lost (Typical)
24h Emergency Response
12 Month Defect Liability
Live-environment specialists — we renovate around your team, not the other way around. Phased execution with weekend-only noisy works
Zero downtime guarantee — structured phasing plan with clear zone-by-zone schedules. Your business never shuts down
Dust control system — negative air machines, sealed barriers, HEPA filtration, and daily site cleanup. No dust migration to occupied zones
Fixed-price renovation — we survey existing conditions before quoting. No surprises for hidden asbestos, corroded pipes, or obsolete wiring
KSA-wide coverage — active renovation projects in Riyadh (KAFD, Olaya), Jeddah (Tahlia, Sari), Dammam (Dhahran), Khobar, and all major cities
SBC compliance — all renovation works meet Saudi Building Code 801 (fire safety) and Civil Defense requirements for occupied buildings
Typical Office Renovation Details
Project Size
100 sqm — 8,000+ sqm (partial or full office renovation)
Typical Duration
2–16 weeks depending on scope. Light refresh (paint, flooring, lighting): 2–4 weeks. Medium renovation (ceiling, partitions, MEP): 4–10 weeks. Full renovation (all systems): 10–16 weeks
Downtime Impact
Zero full-office shutdown. Phased execution means your team stays operational. Noisy works scheduled Thursday–Saturday nights or weekends only
Typical Triggers
Lease renewal (refresh before re-signing), new ownership, outdated finishes (5–7 year cycle), acoustic complaints, high energy bills (pre-LED lighting), damaged ceilings/floors, MEP failures
Light refresh: SAR 350–600 per sqm. Medium renovation: SAR 650–1,200 per sqm. Full renovation: SAR 1,300–2,500 per sqm. Contact us for a site-specific proposal after free audit
ROI Typical
Office renovations typically achieve 50–80% cost vs new fit-out. 3–5 year lease extension value. 30–50% energy savings after LED/AC retrofit. Improved employee satisfaction and retention
Before & After — What Changes
🏚️
Before Renovation
Yellowed ceiling tiles with water stains
Fluorescent lighting (100 lux, high energy)
Carpet worn, stained, or dated pattern
Echoey meeting rooms (NRC 0.20–0.30)
Inadequate data/power outlets
High HVAC noise and inconsistent temps
✨
After Renovation
Fresh mineral fibre or metal ceiling
LED lighting (300–500 lux, 70% energy reduction)
New LVT or carpet tile — modern finish
Acoustic panels — NRC 0.85+ — clear speech
Additional Cat6a points and power outlets
Serviced FCUs, balanced airflow, quiet operation
Ready to Start?
Get a free consultation and quote for your project.