+966 54 469 4766 info@spacearabia.sa Riyadh • Serving KSA
Office Fit-Out • Civil • MEP • Noise-Free Sustainability Consultation
Office Wall Finishes in Saudi Arabia

Turnkey Workspace Solutions — Saudi Arabia

From workplace strategy and office fit-out to furniture, relocation and move-in — Space Arabia coordinates every stage through one accountable project team.

Material Selection

Supply & Installation

Riyadh · Jeddah · Dammam

Plan

Design

Furnish

Build

Relocate

Handover

One team · One programme

Single point of accountability

Why turnkey

One Partner for the Complete Workplace Journey

A workplace project does not end when construction finishes. Furniture, technology, relocation, installation, handover and employee move-in must be coordinated with the fit-out programme — or they become the client's problem at the worst possible moment.

Space Arabia carries that coordination. Instead of managing separate designers, contractors, furniture suppliers and movers, you work with one accountable project team that plans the whole journey, sequences the trades and stays responsible until your workplace is ready to use.

01

Workplace strategy and brief — headcount, workstyles, growth and budget aligned before design begins

01

Design and technical coordination — architecture, MEP, acoustics, AV and joinery resolved together

01

Fit-out and construction — civil and architectural works managed against one programme

01

Furniture and installation — new furniture, existing-asset reuse, delivery and placement to approved layouts

01

Relocation and move-in — sequenced, labelled and coordinated so teams keep working

01

Handover and aftercare — testing, documentation, snagging and post-occupancy support

Direct definition

What Is a Turnkey Workspace Solution?

A turnkey workspace solution coordinates planning, design, construction, building services, furniture, technology, relocation and handover through one integrated project-delivery structure — so the client receives a complete, ready-to-use workplace instead of managing separate contractors for each stage.

One brief

One design team

One programme

One accountable partner

One handover

Start where you are

Choose Your Project Journey

Every workplace project arrives from a different starting point. Four typical journeys — each planned, coordinated and handed over by one accountable team.

Journey 01

New Office

Your situation

You have secured — or are shortlisting — a new office space in Riyadh, Jeddah, Dammam or Al Khobar, and need it designed, built and furnished before your team moves in.

Typical scope

Test-fit layouts, concept and technical design, civil and architectural fit-out, MEP and ELV, acoustics, custom joinery, furniture procurement and installation, move-in coordination and handover.

Main planning considerations

Lease commencement dates, building management rules, approval processes, long-lead materials and furniture, and setting the workplace brief before design starts.

Discuss Paint Finishes

Journey 01

New Office

Your situation

You have secured — or are shortlisting — a new office space in Riyadh, Jeddah, Dammam or Al Khobar, and need it designed, built and furnished before your team moves in.

Typical scope

Test-fit layouts, concept and technical design, civil and architectural fit-out, MEP and ELV, acoustics, custom joinery, furniture procurement and installation, move-in coordination and handover.

Main planning considerations

Lease commencement dates, building management rules, approval processes, long-lead materials and furniture, and setting the workplace brief before design starts.

Discuss Paint Finishes

Complete scope

Fifteen Services. One Coordinated Delivery.

The full turnkey workplace scope — from the first workplace brief to aftercare. Verified Space Arabia capabilities are delivered directly; specialist scopes are coordinated through approved partners and clearly marked.

Workplace Strategy

Business objectives, headcount, department relationships, workstyle and collaboration analysis, meeting and storage requirements, brand, accessibility, technology needs, future growth, budget and target programme — captured in one workplace brief.

Acoustic Solutions

Reverberation control, speech privacy, meeting-room acoustics, acoustic ceilings, wall panels and ceiling baffles, acoustic doors, sound-isolation build-ups, booths and pods. Sound absorption and sound insulation are specified as distinct, separate performance requirements.

MEP & ELV

HVAC, electrical power, lighting, plumbing and drainage, fire-alarm interfaces and fire-protection coordination, data cabling, access-control and CCTV provisions, ELV systems, testing and commissioning — subject to approved drawings and applicable Saudi requirements.

Civil & Architectural Fit-Out

Demolition and site preparation, gypsum and glass partitions, doors, ceilings, flooring, wall finishes, painting, decorative cladding, raised floors, skirting, custom joinery and architectural detailing.

Space Planning

Test-fit layouts, space-efficiency analysis, workstation and circulation planning, department adjacency, meeting and focus rooms, reception, collaboration and breakout areas, pantries, executive offices and furniture layouts.

Interior Design

Concept design, mood boards, material palettes and 3D visualization through to architectural drawings, partition and ceiling plans, flooring and wall-finish schedules, lighting layouts, joinery details, submittals, samples and mock-ups.

AV & Technology

Video conferencing, meeting-room displays, booking panels, digital signage, presentation systems, smart controls, cable management and table connectivity — coordinated directly with your IT team.

Custom Joinery

Reception counters, pantry units, storage walls, executive cabinetry, meeting-room credenzas, feature walls, display units, media walls and custom furniture — manufactured to approved shop drawings.

Office Furniture

Workstations, task seating, executive furniture, meeting tables, collaboration and lounge seating, reception furniture, storage and acoustic booths — selection, samples, mock-ups, procurement, delivery and installation.

Furniture Installation

Delivery coordination, offloading, assembly, placement to approved layouts, levelling and alignment, cable-management coordination, punch-list inspection, packaging removal and final cleaning.

Workplace Relocation

Move strategy, asset inventory, department sequencing, move schedule, packing coordination, labelling, dismantling, transport coordination, reinstallation, IT coordination and post-move support.

Coordinated service · approved specialist partners

Storage & Project Staging

Short-term storage, delivery consolidation, long-lead furniture receipt, asset inventory, protection of stored items and phased release to site — coordinated through approved logistics partners. Space Arabia does not operate its own warehouse.

Coordinated service · approved logistics partners

Decommissioning

Asset inventory, furniture dismantling, signage and branding removal, IT and equipment coordination, reuse assessment, recycling or disposal coordination, final cleaning and landlord handback support.

Coordinated service · subject to confirmed scope

Project Management

Single point of contact, scope control, programme development, design coordination, procurement tracking, trade coordination, site supervision, progress reporting, quality control, health-and-safety coordination, change management, snagging and handover management.

Handover & Aftercare

Final inspections, snag rectification, testing and commissioning records, deep cleaning, user orientation, as-built documentation, O&M manuals, warranty information, move-in coordination and post-occupancy support according to the contract.

The full lifecycle

From First Brief to Responsible Exit Journey

A workplace is a lifecycle, not a single project. Space Arabia stays accountable through every phase — including what happens to your assets when the space changes again.

01

Plan & Design

Workplace brief, site survey, test-fits, concept and technical design, budget and approvals.

02

Build & Coordinate

Construction, MEP and ELV, acoustics, joinery — trades sequenced against one programme.

03

Furnish & Install

Furniture procurement, delivery coordination, installation and placement to approved layouts.

04

Relocate & Move In

Asset inventory, labelling, sequenced moving, reinstallation, IT cutover and employee move-in.

05

Support, Reuse or Decommission

Aftercare, warranty support, reuse assessment and responsible disposition when needs change.

Why Space Arabia

A finishing contractor that thinks like a fit-out partner

What you can verify on every project — no slogans, just the way we work.

01

Site Survey & Requirement Assessment

We visit your office, document each zone and understand traffic levels, brand requirements, timelines and occupancy constraints.

02

Existing-Wall & Substrate Inspection

Walls are checked for cracks, moisture, levelness and previous coatings — the condition report drives the preparation scope.

03

Finish & Color Consultation

Our team recommends systems per zone — balancing appearance, durability, acoustics and budget — with color matching to your identity.

04

Samples & Mock-Up Approval

Physical samples, color drawdowns and mock-up panels are reviewed and approved by you before any full installation begins.

05

Technical Coordination & Quantities

Finishes are coordinated with partitions, ceilings, electrical and data points — and quantities confirmed in a transparent BOQ.

06

Surface Preparation

Crack repair, skimming, sanding and priming — the essential stage that determines adhesion, flatness and the final look.

07

Professional Installation

Trained applicators install each system to manufacturer requirements — clean seams, true lines and protected surroundings.

08

Quality Inspection & Handover

A joint inspection, snag correction and documented handover — with maintenance guidance for each installed finish.

08

Quality Inspection & Handover

A joint inspection, snag correction and documented handover — with maintenance guidance for each installed finish.

One team · One programme

Single point of accountability

Why turnkey

One Partner for the Complete Workplace Journey

A workplace project does not end when construction finishes. Furniture, technology, relocation, installation, handover and employee move-in must be coordinated with the fit-out programme — or they become the client's problem at the worst possible moment.

Space Arabia carries that coordination. Instead of managing separate designers, contractors, furniture suppliers and movers, you work with one accountable project team that plans the whole journey, sequences the trades and stays responsible until your workplace is ready to use.

01

Workplace strategy and brief — headcount, workstyles, growth and budget aligned before design begins

01

Design and technical coordination — architecture, MEP, acoustics, AV and joinery resolved together

01

Fit-out and construction — civil and architectural works managed against one programme

01

Furniture and installation — new furniture, existing-asset reuse, delivery and placement to approved layouts

01

Relocation and move-in — sequenced, labelled and coordinated so teams keep working

01

Handover and aftercare — testing, documentation, snagging and post-occupancy support

Selection Guide

Choosing finishes by office area

A practical starting point — final specifications always follow the site survey, approved samples and your consultant's requirements.

Furniture option

Suitable when

Main considerations

Furniture option

New standards, expansion or full redesign

Lead time, ergonomics, warranty and design consistency

Reuse existing furniture

Assets remain functional and suit the new plan

Condition, dimensions, compatibility and reconfiguration

Mixed furniture strategy

Budget and programme require flexibility

Visual consistency, availability and lifecycle value

Surplus asset disposition

Office closure, consolidation or replacement

Reuse, resale, donation, recycling and disposal

1 · Reuse within your organization

2 · Relocate to another branch

3 · Refurbishment

5 · Donation, where practical

4 · Resale or liquidation

5 · Donation, where practical

6 · Material recycling

7 · Responsible disposal — last option

Surplus options are reviewed in this responsible order, and disposition routes are documented per project. Space Arabia does not claim a zero-landfill result and does not hold a pre-owned furniture inventory; resale or liquidation is coordinated through approved partners where included in scope.

Technical Guidance

Material & performance considerations

A practical starting point — final specifications always follow the site survey, approved samples and your consultant's requirements.

Substrate Condition

New gypsum, old paint or concrete each need a different preparation and primer system.

Durability

System lifespan is matched to traffic — premium corridors need heavier-duty finishes than quiet offices.

VOC & Indoor Air

Low-VOC paint and adhesive options support healthier indoor environments during and after works.

Fire Performance

Finish systems are selected to meet the project's fire-performance requirements and consultant specifications.

Washability

Scrubbable paints and vinyls keep high-touch areas presentable with routine cleaning.

Color Consistency

Batched materials, drawdown approvals and controlled lighting checks keep colors true across floors.

Acoustic Performance

Fabric panels and acoustic slat systems reduce echo; room-to-room soundproofing is a separate construction question.

Impact Resistance

HPL, heavy-duty vinyl and protective detailing resist trolleys, chairs and daily knocks.

Cleaning & Maintenance

Each handover includes care guidance matched to the installed system.

Replaceability

Panelized and sectional systems allow local repair or replacement without full re-works.

Lighting Interaction

Grazing light flattens some finishes and exposes others — we plan lighting and texture together.

Samples & Mock-Ups

Nothing is installed at scale before physical samples and mock-ups are approved on site.

Final specifications always depend on project requirements, the selected manufacturer, approved samples and consultant requirements. We document the agreed system for every zone before installation begins.

Applications

Where our wall finishes work

From single feature walls to full multi-floor renovation programmes, across every kind of working environment.

Corporate Headquarters

Training & Education Spaces

Healthcare & Clinic Offices

Hospitality & Breakout Zones

Banks & Financial Firms

Banks & Financial Firms

Government Offices

Coworking Environments

Open-Plan Workspaces

Reception & Waiting Areas

Meeting & Boardrooms

Private Offices

— Our Work

Projects delivered by Space Arabia

Real workplaces furnished with Space Arabia manufacturing — government and private-sector offices across the Kingdom.

Government office — Riyadh

Open-plan workstation floor

Workstation installation

Government office — Riyadh

Open-plan workstation floor

Frequently Asked Questions

Everything You Need to Know

Common questions about our fit-out services, acoustic solutions, and project process.

Office fit-out is the full process of designing, constructing, and finishing an empty or existing office space so it is ready for use. At Space Arabia, our scope covers civil works (partitioning, flooring, ceilings, joinery), MEP coordination (electrical, mechanical, plumbing), acoustic treatment, furniture supply, and handover. We manage everything under one contract from initial briefing through to final handover with warranty.

Project duration depends on the size and complexity. For a standard office of 300–600 m², expect 6–10 weeks from design approval to handover. Larger projects (1,000 m²+) typically run 12–20 weeks. We produce a detailed project programme at BOQ stage so you know exactly what to expect, week by week.

Fit-out costs in Saudi Arabia typically range from SAR 600–1,200/m² for standard specification, SAR 1,200–2,000/m² for mid-range, and SAR 2,000–3,500+/m² for premium and bespoke fit-outs. Costs vary by scope, finishes, MEP complexity, and location. Contact us for a detailed BOQ based on your specific requirements.

Yes. Space Arabia manages full MEP (mechanical, electrical, and plumbing) coordination in-house, including clash detection, authority submissions, and commissioning. We coordinate directly with landlords, base-build consultants, and regulatory bodies, so you have a single point of responsibility throughout.

We supply and install a comprehensive range of acoustic products: sound-absorbing wall panels, ceiling baffles and tiles, acoustic glazing systems with appropriate seals and frames, acoustic pods and phone booths, door perimeter seals, and raised floor acoustic underlays. We can also carry out acoustic testing and provide NRC/STC-rated specifications for any project.

Yes. We regularly carry out phased fit-out and refurbishment projects in live office environments. We work in defined zones with hoarding and dust barriers, schedule noisy works outside business hours, and maintain dedicated site access routes that keep your staff separate from the construction activity throughout the project.

Yes. Space Arabia Company LLC holds a valid Saudi Commercial Registration (CR: 7039573766) and VAT Registration (VAT: 312360374700003). We are fully compliant with ZATCA, the Saudi Building Code, and relevant SASO standards. Copies of our certificates are available on request.

Our main delivery area covers Riyadh (including KAFD, Olaya, and Malaz districts), Jeddah, Dammam, and Al Khobar. We also undertake projects in Makkah, Madinah, Tabuk, and other KSA cities on a case-by-case basis. Contact us to discuss your project location.

We have delivered projects for corporate offices, government ministries and public-sector entities, educational institutions, healthcare facilities, retail and hospitality environments, and industrial facilities. Our client base spans Saudi national companies, multinational corporations, and Vision 2030-linked projects.

Simply send us a message on WhatsApp (+966 54 469 4766) or email sales@spacearabia.sa with your project location, approximate area, and a brief description of your requirements. We will arrange a site visit or a consultation call within 24 hours and provide a preliminary scope and budget estimate at no charge.

Yes. All Space Arabia projects include a minimum 12-month defects liability period (DLP) covering workmanship and installed systems. Manufacturer warranties on products such as acoustic panels, raised flooring, and furniture typically extend 5–10 years. All warranty terms are documented clearly in the contract.

Yes. We have a dedicated furniture division offering ergonomic seating, height-adjustable desks, executive suites, collaborative and breakout furniture, storage systems, and acoustic soft furnishings. We work with leading international and regional manufacturers and can manage the full furniture package under a single contract.

Get Started

Ready to transform your workspace?

Share your requirements and Space Arabia will respond with scope options, timeline, and a transparent quotation pathway for fit-out, MEP, joinery, furniture, and acoustic solutions.