MEP works represent 30-40% of a fit-out budget and — when poorly coordinated — the single biggest source of delays and cost overruns. Space Arabia manages all three disciplines under one contract with a shared coordination model and single point of accountability.
VRF/VRV systems, ducted FCUs, chilled water AHUs, precision cooling, kitchen extract, toilet ventilation, and BMS integration. Designed to ASHRAE 55 for the Saudi climate.
HV/LV distribution, power, LED lighting with photometric design, emergency lighting, DALI controls, UPS, and all ELV systems — SASO and SEC compliant.
Cold and hot water distribution, drainage, staff WC fit-out, kitchen plumbing, water heaters, and grease traps — SBC compliant with MOMRA-approved materials.
Licensed engineers produce HVAC load calculations, electrical load schedules, and plumbing sizing — submitted to client and landlord for approval.
All MEP services are modelled in 3D and clash-detected against structure and ceilings before installation begins.
Equipment submittals, data sheets, and material samples submitted for client and consultant approval.
Trade-sequenced installation followed by individual system testing, commissioning, and balancing.
As-built drawings, O&M manuals, test certificates, warranties, and training for FM team submitted before practical completion.